BOM Management
Find it: Management → Parts Management → BOM (Assets & Tools group).
Sound familiar?
- "The press is down. Which parts do we need to fix it?"
- "Is this bearing critical for line 3, or can we wait a week?"
- "Which machines even use this part?"
Without a bill of materials, every breakdown starts with a guessing game.
The Problem
Assemblies need specific parts in specific quantities, but that knowledge lives in binders, spreadsheets, and senior techs' heads. When an asset fails, technicians order from memory. Critical spares stock out at the worst moment, and slow movers pile up because nobody knows which assets actually use them.
What OpexMX BOM Management Does
Links parts to assets with required quantities, so the parts list for any asset is one lookup away.
BOM by Asset
- Part items: attach any catalog part to an asset
- Quantity and unit: how much of it the assembly needs
- Critical flag: mark the spares that stop production when missing
- Notes: mounting details, torque specs, substitutions
Where Used
Works the lookup in both directions. Pick a part and see every asset whose BOM includes it. Before you reorder, discontinue, or reallocate stock, you know what depends on it.
Part Details on the BOM Line
Each BOM line carries the part's stock level, cost, and category, so the technician looking at a broken machine sees availability, not just a name.
How It Works
- Open Parts Management → BOM.
- Pick an asset and add the parts it consumes, with quantities.
- Flag critical spares so buyers treat them differently.
- Use Where Used from the part side when planning a reorder or a change.
Who Uses This?
| Role | What They Care About |
|---|---|
| Technicians | The parts list for the machine in front of them |
| Storeroom | Which assets compete for the same spare |
| Maintenance planning | Critical spares covered before breakdowns |
| Engineering | One place where assembly composition lives |
Pro Tips
- Start with your five most critical machines; a partial BOM beats no BOM.
- Flag sparingly: if everything is critical, nothing is.
- Run Where Used before deleting or swapping any part item.
- Review BOMs after every overhaul; assemblies change.
Integrations
- Parts Management: BOM lines come from the part catalog with live stock
- Purchase Requests: shortage on a critical BOM line becomes a request
- Tickets: technicians resolve parts against the asset's BOM