PM Compliance Tracking
Measure whether planned PMs actually happen.
PM Compliance Tracking
A PM schedule only works if the work gets done. Compliance tracking tells you what percentage of planned PMs were completed on time.
What to Watch
- PM compliance rate (target high, typically above 90%)
- Overdue PMs and why
- PMs skipped or deferred
Tips
Low compliance is a red flag — either the schedule is unrealistic or the team is overloaded. Investigate, do not just chase the number.