PM Compliance Tracking

Measure whether planned PMs actually happen.

PM Compliance Tracking

A PM schedule only works if the work gets done. Compliance tracking tells you what percentage of planned PMs were completed on time.

What to Watch

  • PM compliance rate (target high, typically above 90%)
  • Overdue PMs and why
  • PMs skipped or deferred

Tips

Low compliance is a red flag — either the schedule is unrealistic or the team is overloaded. Investigate, do not just chase the number.