Skip to content
Progres Anda0%
Menengah20 menit

Optimizing PM Intervals

Tune intervals using real failure data.

Optimizing PM Intervals

PM intervals are not set-and-forget. Tune them with real data so you maintain enough — but not more than necessary.

Signals to Adjust

  • Failures between PMs → interval too long
  • Inspections finding nothing → interval may be too short
  • Rising cost with no reliability gain → over-maintaining

Tips

Review intervals quarterly against failure history. Small tweaks compound into big savings.