Calendar-Based Scheduling
Trigger PMs on time intervals.
Calendar-Based Scheduling
Calendar-based PMs fire on a time interval — every week, month, or quarter — regardless of how much the asset ran.
Best For
- Safety inspections with legal cadences
- Low-usage assets
- Degradation driven by time (corrosion, aging)
Tips
For assets that run unevenly, calendar intervals can over- or under-maintain. Consider a meter trigger instead.