Calendar-Based Scheduling

Trigger PMs on time intervals.

Calendar-Based Scheduling

Calendar-based PMs fire on a time interval — every week, month, or quarter — regardless of how much the asset ran.

Best For

  • Safety inspections with legal cadences
  • Low-usage assets
  • Degradation driven by time (corrosion, aging)

Tips

For assets that run unevenly, calendar intervals can over- or under-maintain. Consider a meter trigger instead.